Site conditions & geotech
Yes — it’s mandatory for footing design and approval.
Yes — we’ll arrange quotes from trusted local geotechnical engineers so you’re not left searching on your own.
Typically several days to 2 weeks, depending on the consultant.
Footings & structure
Yes — footing design and certification are included in your Approval Package as part of our standard engineering process. If your site’s soil conditions call for a non-standard footing solution, we’ll flag this during the geotechnical review and quote it separately.
To keep your fixed price and build timeline intact, all structural design and certification is handled through Auvigreen’s own engineering team. The agreed scope and any site-specific requirements are confirmed before construction starts.
Costs & quoting
We include a Town Planning fee when the certifier advises that a council application is required. Sites with overlays, such as bushfire risk, may need additional assessment. We’ll confirm during the desktop review.
Yes — an additional approval fee applies for each extra dwelling on the same site, since each unit requires assessment. Ask us for an exact figure once we’ve reviewed your site plan.
Other costs to budget for
- Consultant fees for site-specific reports, including bushfire, flood or landslip assessments.
- Council application/referral fees, which vary by local government area.
- Set-out survey at the footing stage.
- Levies and insurances, including Home Warranty Insurance or Owner-Builder requirements where applicable.
- Septic design if your site isn’t connected to mains sewerage.
We assess whether your site requires a BAL report during the approval process and recommend allowing for site-specific reports in your budget.
Approval process & timeline
Entirely up to you — but construction can’t start until approvals and documentation are finalised. Starting early means everything is ready when the build is scheduled.
It varies by council processing time, consultant availability, and how quickly requests for information are answered. Typically several weeks.
Because our fixed-price, no-surprises promise depends on approvals and construction being tightly coordinated, we manage the full compliance and approval process as part of your build. If you’ve already started an approval independently elsewhere, we’re not able to take that over partway through — best to bring us in from the start.