COMPLIANCE & APPROVALS

An Cư An Tâm

Modular Home
Compliance & Approvals

Certified. Trusted. Home. Auvigreen homes are designed to meet the requirements of the National Construction Code (NCC) and can be approved as a Class 1a dwelling.

White modular home with timber entry steps and landscaped garden
Your home Design & compliance Approval process FAQs

REAL HOME, FOR THE PEOPLE YOU LOVE

A home for real life.

Class 1a is the same classification as a standard house under the National Construction Code. Depending on your site, intended use and council, approval pathways can include:

Classification and approval are confirmed for each project; the intended use may require a different approval pathway.

DESIGNED FOR AUSTRALIAN COMPLIANCE

Modular Home Compliance Requirements

Confidence in the details. Structure, comfort and the approval process — considered together, for your site.

Portrait of a woman in a burgundy blazer

WE’VE NAVIGATED A NEW SYSTEM BEFORE

The Building
Approval Process

Now we do it with you. Council approvals can feel like a maze if you’ve never been through one; different forms, different consultants, and different rules depending on your site.

Auvigreen’s team walks every step of it alongside you, from your first enquiry through structural certification, energy compliance, and building approval, to the day you get the keys.

You don’t need to already know how the system works. That’s our job!

Ask us about your property

FROM YOUR FIRST QUESTION TO YOUR FRONT DOOR

The Building
Approval Process

Six steps, with a team
alongside you.

Preliminary site assessment

STEP 01 / 06

Preliminary site assessment

Send us your property location and a basic sketch of where you’d like your home placed. We’ll confirm whether your site and intended use meet the requirements for a Building Approval (BA).

Quote & engagement

STEP 02 / 06

Quote & engagement

Once assessed, you’ll receive a quote covering estimated costs for building/development approval. Sign and return the quote with the required fee to begin.

Engineering & certification kick-off

STEP 03 / 06

Engineering & certification kick-off

We coordinate with our structural engineer (RPEQ), energy assessor, and building certifier to begin the certification process. You’ll need to separately arrange a geotechnical engineer and land surveyor for your site.

Document submission & building approval

STEP 04 / 06

Document submission & building approval

We manage submission of all documents. Our certifier reviews everything for compliance with the Building Code of Australia and local planning rules. On approval, you receive a Decision Notice and Approved Stamped Plans, authorising construction to begin.

Construction

STEP 05 / 06

Construction

With the Building Approval in place, construction begins per the approved plans. You’ll be notified of required inspection stages along the way.

Final inspection & occupancy

STEP 06 / 06

Final inspection & occupancy

Once construction is complete, a final inspection confirms your home is ready for occupancy, and you receive the relevant occupancy documentation. Your certifier confirms the forms required for your project.

A FEW THINGS YOU MAY BE WONDERING

Frequently Asked
Questions

Ask another question

Yes — it’s mandatory for footing design and approval.

Yes — we’ll arrange quotes from trusted local geotechnical engineers so you’re not left searching on your own.

Typically several days to 2 weeks, depending on the consultant.

Yes — footing design and certification are included in your Approval Package as part of our standard engineering process. If your site’s soil conditions call for a non-standard footing solution, we’ll flag this during the geotechnical review and quote it separately.

To keep your fixed price and build timeline intact, all structural design and certification is handled through Auvigreen’s own engineering team. The agreed scope and any site-specific requirements are confirmed before construction starts.

We include a Town Planning fee when the certifier advises that a council application is required. Sites with overlays, such as bushfire risk, may need additional assessment. We’ll confirm during the desktop review.

Yes — an additional approval fee applies for each extra dwelling on the same site, since each unit requires assessment. Ask us for an exact figure once we’ve reviewed your site plan.

  • Consultant fees for site-specific reports, including bushfire, flood or landslip assessments.
  • Council application/referral fees, which vary by local government area.
  • Set-out survey at the footing stage.
  • Levies and insurances, including Home Warranty Insurance or Owner-Builder requirements where applicable.
  • Septic design if your site isn’t connected to mains sewerage.

We assess whether your site requires a BAL report during the approval process and recommend allowing for site-specific reports in your budget.

Entirely up to you — but construction can’t start until approvals and documentation are finalised. Starting early means everything is ready when the build is scheduled.

It varies by council processing time, consultant availability, and how quickly requests for information are answered. Typically several weeks.

Because our fixed-price, no-surprises promise depends on approvals and construction being tightly coordinated, we manage the full compliance and approval process as part of your build. If you’ve already started an approval independently elsewhere, we’re not able to take that over partway through — best to bring us in from the start.

Yes — it’s mandatory for footing design and approval.

Yes — we’ll arrange quotes from trusted local geotechnical engineers so you’re not left searching on your own.

Typically several days to 2 weeks, depending on the consultant.

Yes — footing design and certification are included in your Approval Package as part of our standard engineering process. If your site’s soil conditions call for a non-standard footing solution, we’ll flag this during the geotechnical review and quote it separately.

To keep your fixed price and build timeline intact, all structural design and certification is handled through Auvigreen’s own engineering team. The agreed scope and any site-specific requirements are confirmed before construction starts.

We include a Town Planning fee when the certifier advises that a council application is required. Sites with overlays, such as bushfire risk, may need additional assessment. We’ll confirm during the desktop review.

Yes — an additional approval fee applies for each extra dwelling on the same site, since each unit requires assessment. Ask us for an exact figure once we’ve reviewed your site plan.

  • Consultant fees for site-specific reports, including bushfire, flood or landslip assessments.
  • Council application/referral fees, which vary by local government area.
  • Set-out survey at the footing stage.
  • Levies and insurances, including Home Warranty Insurance or Owner-Builder requirements where applicable.
  • Septic design if your site isn’t connected to mains sewerage.

We assess whether your site requires a BAL report during the approval process and recommend allowing for site-specific reports in your budget.

Entirely up to you — but construction can’t start until approvals and documentation are finalised. Starting early means everything is ready when the build is scheduled.

It varies by council processing time, consultant availability, and how quickly requests for information are answered. Typically several weeks.

Because our fixed-price, no-surprises promise depends on approvals and construction being tightly coordinated, we manage the full compliance and approval process as part of your build. If you’ve already started an approval independently elsewhere, we’re not able to take that over partway through — best to bring us in from the start.